Our team delivered the full plumbing and civil services package for the new 32-bed ward at Royal Darwin Hospital. Our contribution to this project included:
- Civil stormwater upgrades
- Installation of inground sewer and watermain services, featuring directionally drilled pipework beneath existing structures to minimise site disruption
- Inground fire hydrant service
- Installation of a 10,000L potable water storage tank with pressure pump system
- Hot water service comprising heat pump and storage tanks
- Installation of hot and cold-water ring mains
- Installation of a suspended sewer system
- Installation of a siphonic roof drainage system
- Installation of renal ports with backflow-protected water supply


